

|
Marine and Heavy Construction |
|
Lakes and Rivers Contracting, Inc. |

|
Below is a list of recent projects completed by Lakes and Rivers Contracting, Inc. |
|
Completed in November of 2004 for IDOT, the project consisted of replacing the existing cast in place structure with a new precast/prestressed structure. |
|
Performed in both 2003 and 2005, the projects involved removing timber debris from around IDOT structures crossing waterways. |
|
Scheduled for final completion in May 2006, the project involves the removal of the existing 74 year old structure and replacing it with a new two span, cast in place and post tensioned bridge. |
|
Completed in 2004, the project consisted of adding armor plates to approximately 600 feet of pier and resurfacing the pier with a 1’ reinforced concrete overlay. |
|
Project involved replacing the existing limestone bearing seats with new precast concrete bearing seats during a 30 hour track outage. |
|
Bayview Lane over Pistakee lake channel |
|
Waukegan Harbor South Pier Rehab |
|
Main Street Bridge Replacement—naperville |
|
IDOT Debris Removal |
|
EJ&E Railway Bridge 123 Substructure |
|
Recent Project List |




