EJ&E Bridge 123 Substructure Repair |
|
The structural steel bridge is set on limestone block abutments which had deteriorated at the bridge seats requiring replacement of the upper abutment and bridge seats. |
|
After the removal of the superstructure, the existing abutments and bridge seats were removed to predefined limits to allow for the installation of the new precast bridge seats. |
Completion Date: 7/30/2004 |
Job Number: 04006 |
Progress Pictures |
|
The superstructure was removed in one piece and set to the side for work on the bridge bearings. |
|
Exisiting Structure with deteriorated abutments |
|
Superstructure Removal
|
|
Upper Abutment and Bridge Seat Removal |
|
Project is located North of Wayne, IL. In the Pratt Wayne Woods Forest Preserve. Bridge was the EJ&E crossing of the Canadian National (CN)track and was accessed along CN right-of-way. |
|
Owner: EJ&E Railway |
|
Engineer: EJ&E Railway |



|
New bridge seats |
|
New precast concrete bridge seats were set in place, pinned and grouted into the existing limestone abutment, and the superstructure reset, leveled and anchored. |